Well, things at ABN have really got busy! We didn't get a flight in on Monday as hoped for, so it waited until today for the right conditions to bring more folk in.
Actually, on Monday, we had a working bee for the imminent influx, putting up several sleeping tents. We now have a substantial village of some 19 pyramids.
On the science front, the last two days have seen good progress. The firn air drilling has now reached 30m depth, and undertaken the first serious air extraction this evening. The main drilling is also underway, reaching 12.6m this evening (albeit starting in a 4m deep basement). So everyone is feeling very pleased and there a lot of smiles around.
Many of the smiles are on faces of the 6 new folk who flew in today ... Pleased to finally be at ABN after much waiting at Casey. Actually, the ABN skiway was like a real airport today as we no only had our Basler and twin otter flights bringing people in, but we also had a twin otter from Concordia that dropped 5 passengers to connect through to Casey on our returning aircraft!
The adverse flying weather over the last two weeks and slow arrival of the full team has put us behind a little, and there's a lot to be done in coming days, especially for those of us scheduled to change out around NewYear. We will celebrate Christmas, but it will be a (slightly shortened) work day so we can keep things happening. In order to allow today's arrivals to settle (especially chef Jenny) we are delaying our Christmas by a day. This will also allow our final few arrivals, scheduled here tomorrow, the chance to be part of the celebrations.
So, on this Christmas Eve, best wishes to all blog readers for a very happy Christmas. Ours will be white, bright and night less, as well as a little delayed.
The Aurora Basin North ice core was drilled at a site 550km inland of Casey Research Station in December-January 2013/14. This was a personal blog that followed my experience through the project as I traversed in, help get the camp set up and started coring. This was blogged with limited satellite emails: quite restricted at the time. This blog is retained as an archive of the fieldwork.
Wednesday, December 25, 2013
Monday, December 23, 2013
Aurora Basin: December 22
After much preparation, today the project has moved fully into its science phase.
The camp was a hive of activity, with the firn air and main core drilling teams well underway while others put up more tents for incoming personnel, marked out the skiway, attended to mechanical needs and prepared meals.
The most dramatic event of the day was the installation of the main drilling tent over the 1.5m deep "basement" that had been excavated for it. As I mentioned yesterday, the tent was towed over the top of the hole, and the whole thing went very smoothly. The drillers in this tent can now boast of cathedral ceilings! They spent the rest of the day cleaning up the excavation from inside and towing out the remaining snow - some 42 cubic metres was removed in all over a couple of days!
The other big event was the commencement of the first coring - in the firn air tent, we completed the assembly of the drill and sawing out the 2.2 metre deep trench that it swings in with enough time to commence drilling. We did three drill runs each with cores a bit over a metre taking us to 5.85m depth. Jerome and David then installed the firn air pumping device (which consists of a cylindrical bladder a couple of metres long) to seal the hole and pump trapped air from below it. This is largely an initial test of the equipment and went well.
Tomorrow, weather being favourable, we expect more newcomers to fly in - probably six of them. This will provide extra hands for existing tasks, the ability to start setting up new facets of the project, and also bring greater support in the form of our camp chef.
Everyone seems to be settling into camp life in a cold, remote and high altitude location. We all have related stories to tell about the vagaries of getting in and out of our tents, changing and into sleeping bags with the minimum of hassle and exposure. Some of the tents seem to be better designed for these conditions than others. The usually favourite polar pyramid tents have undergone some redesign which includes very heavy fabric that doesn't allow easy entry/exit in these very cold conditions. Consequently those of us who have these tents all find ourselves stumbling and snagging as we go in and out.
Sleeping is actually pretty comfortable with multiple layers of foam and camping mattresses underneath and two nested sleeping bags. If you want water overnight, it is necessary to keep the water bottle in the sleeping bag to avoid freezing. Getting up in the middle of the night, especially with the pyramid entrance snagging, is not at all welcome, and even in the morning, getting up into temperatures around -25C to -30C takes a bit of planning and willpower.
In other respects, we have a nice comfortable living/kitchen area, and now even email. As I write, three of us night owls are clicking away, sitting around our revered kerosene heater, partly out of interest in email, and partly procrastinating over the cold-dash to bed.
Hopefully tomorrow brings more folk to ABN and plenty more metres of ice core.
The camp was a hive of activity, with the firn air and main core drilling teams well underway while others put up more tents for incoming personnel, marked out the skiway, attended to mechanical needs and prepared meals.
The most dramatic event of the day was the installation of the main drilling tent over the 1.5m deep "basement" that had been excavated for it. As I mentioned yesterday, the tent was towed over the top of the hole, and the whole thing went very smoothly. The drillers in this tent can now boast of cathedral ceilings! They spent the rest of the day cleaning up the excavation from inside and towing out the remaining snow - some 42 cubic metres was removed in all over a couple of days!
The other big event was the commencement of the first coring - in the firn air tent, we completed the assembly of the drill and sawing out the 2.2 metre deep trench that it swings in with enough time to commence drilling. We did three drill runs each with cores a bit over a metre taking us to 5.85m depth. Jerome and David then installed the firn air pumping device (which consists of a cylindrical bladder a couple of metres long) to seal the hole and pump trapped air from below it. This is largely an initial test of the equipment and went well.
Tomorrow, weather being favourable, we expect more newcomers to fly in - probably six of them. This will provide extra hands for existing tasks, the ability to start setting up new facets of the project, and also bring greater support in the form of our camp chef.
Everyone seems to be settling into camp life in a cold, remote and high altitude location. We all have related stories to tell about the vagaries of getting in and out of our tents, changing and into sleeping bags with the minimum of hassle and exposure. Some of the tents seem to be better designed for these conditions than others. The usually favourite polar pyramid tents have undergone some redesign which includes very heavy fabric that doesn't allow easy entry/exit in these very cold conditions. Consequently those of us who have these tents all find ourselves stumbling and snagging as we go in and out.
Sleeping is actually pretty comfortable with multiple layers of foam and camping mattresses underneath and two nested sleeping bags. If you want water overnight, it is necessary to keep the water bottle in the sleeping bag to avoid freezing. Getting up in the middle of the night, especially with the pyramid entrance snagging, is not at all welcome, and even in the morning, getting up into temperatures around -25C to -30C takes a bit of planning and willpower.
In other respects, we have a nice comfortable living/kitchen area, and now even email. As I write, three of us night owls are clicking away, sitting around our revered kerosene heater, partly out of interest in email, and partly procrastinating over the cold-dash to bed.
Hopefully tomorrow brings more folk to ABN and plenty more metres of ice core.
Sunday, December 22, 2013
Aurora Basin Camp Update: Post Traverse Departure
It has been an eventful few days at the ABN camp. First our numbers dwindled to just three as we saw the French traverse off, and then, yesterday we received six of the team in from Casey.
The departure of our French colleagues was a mixed experience: bidding farewarell to colleagues we had come to know at close quarters in the two plus weeks since the traverse began, but also knowing we were moving on to the next phase in the project.
There was some reluctance on behalf of the traverse to leave just three of us in such a remote location, but by Thursday we were very well established and they have other commitments and fuel limitations which made a departure timely. We watched them complete their pre-start routine, warming the tractors as they lumbered around a groomed track to warm up before hitching up and trying to move. In the days on site, they vans had stuck pretty well, and it took some fancy work to get it all moving, unbogging a couple of stuck tractors on the way. They crawled off onto the horizon, becoming small specks after many tens of minutes.
The weather on departure day wasn't suitable for a flight, so we spent most of our efforts getting the camp ready for more people - putting bedding in tents, figuring out how to cram all the accumulated gear into sensible places so that newcomers could fit and getting food/kitchen similarly ready.
Yesterday we finished preparations, including erecting a pretty serious looking windsock for the skiway. Then we got news that flying was to happen. We initially got a basler flight loaded with cargo, followed by three of the team on a twin otter. It was great to welcome in Mark, the project leader, along with the doctor, Malcolm, and Simon, one of the Danish drilling crew.
The weather was perfect - the best we have had, with temperatures above minus 20, virtually no wind and clear skies. It was also quite satisfying to see a perfect and smooth landing by both aircraft on the skiway which had been the focus of so much effort in the past week or so.
The conditions allowed for a second round of flights, so we had another basler (cargo) and three more crew: Trevor (Danish, driller), Jerome (French, firn air analyst/driller) and David (Australian, firn air). This brought us up to the basic complement required to do the main science tasks, and so gives us some insurance that regardless of weather from here, we will be able to secure the main goals.
With the extra cargo, we have been able to refine the camp infrastructure, importantly for all, getting the full communications and email running - hence the resumption of blogging.
Today we got another two flights with cargo only, and got stuck into the science preparations. We have one drill for the firn air work largely assembled and are getting things ready for some drilling maybe tomorrow. The drill requires a trench to be dug so that it can be swung from horizontal to vertical in operation. The main drill and tent also require a similar trench, but because the drill is taller, the team have decided that the best way to fit in the tent is to excavate the entire inside the tent to a couple of metres depth. They have begun this task with a snow blower, and will then tow the constructed tent over the top - the tents aren't designed for this, so tomorrow may have its challenges!
So all is humming along well. We really would like to see the rest of the team in camp as soon as practical, and we are hopeful that this will transpire in the coming couple of days.
--
The departure of our French colleagues was a mixed experience: bidding farewarell to colleagues we had come to know at close quarters in the two plus weeks since the traverse began, but also knowing we were moving on to the next phase in the project.
There was some reluctance on behalf of the traverse to leave just three of us in such a remote location, but by Thursday we were very well established and they have other commitments and fuel limitations which made a departure timely. We watched them complete their pre-start routine, warming the tractors as they lumbered around a groomed track to warm up before hitching up and trying to move. In the days on site, they vans had stuck pretty well, and it took some fancy work to get it all moving, unbogging a couple of stuck tractors on the way. They crawled off onto the horizon, becoming small specks after many tens of minutes.
The weather on departure day wasn't suitable for a flight, so we spent most of our efforts getting the camp ready for more people - putting bedding in tents, figuring out how to cram all the accumulated gear into sensible places so that newcomers could fit and getting food/kitchen similarly ready.
Yesterday we finished preparations, including erecting a pretty serious looking windsock for the skiway. Then we got news that flying was to happen. We initially got a basler flight loaded with cargo, followed by three of the team on a twin otter. It was great to welcome in Mark, the project leader, along with the doctor, Malcolm, and Simon, one of the Danish drilling crew.
The weather was perfect - the best we have had, with temperatures above minus 20, virtually no wind and clear skies. It was also quite satisfying to see a perfect and smooth landing by both aircraft on the skiway which had been the focus of so much effort in the past week or so.
The conditions allowed for a second round of flights, so we had another basler (cargo) and three more crew: Trevor (Danish, driller), Jerome (French, firn air analyst/driller) and David (Australian, firn air). This brought us up to the basic complement required to do the main science tasks, and so gives us some insurance that regardless of weather from here, we will be able to secure the main goals.
With the extra cargo, we have been able to refine the camp infrastructure, importantly for all, getting the full communications and email running - hence the resumption of blogging.
Today we got another two flights with cargo only, and got stuck into the science preparations. We have one drill for the firn air work largely assembled and are getting things ready for some drilling maybe tomorrow. The drill requires a trench to be dug so that it can be swung from horizontal to vertical in operation. The main drill and tent also require a similar trench, but because the drill is taller, the team have decided that the best way to fit in the tent is to excavate the entire inside the tent to a couple of metres depth. They have begun this task with a snow blower, and will then tow the constructed tent over the top - the tents aren't designed for this, so tomorrow may have its challenges!
So all is humming along well. We really would like to see the rest of the team in camp as soon as practical, and we are hopeful that this will transpire in the coming couple of days.
--
Aurora Basin Camp Update: First post traverse
It has been an eventful few days at the ABN camp. First our numbers dwindled to just three as we saw the French traverse off, and then, yesterday we received six of the team in from Casey.
The departure of our French colleagues was a mixed experience: bidding farewarell to colleagues we had come to know at close quarters in the two plus weeks since the traverse began, but also knowing we were moving on to the next phase in the project.
There was some reluctance on behalf of the traverse to leave just three of us in such a remote location, but by Thursday we were very well established and they have other commitments and fuel limitations which made a departure timely. We watched them complete their pre-start routine, warming the tractors as they lumbered around a groomed track to warm up before hitching up and trying to move. In the days on site, they vans had stuck pretty well, and it took some fancy work to get it all moving, unbogging a couple of stuck tractors on the way. They crawled off onto the horizon, becoming small specks after many tens of minutes.
The weather on departure day wasn't suitable for a flight, so we spent most of our efforts getting the camp ready for more people - putting bedding in tents, figuring out how to cram all the accumulated gear into sensible places so that newcomers could fit and getting food/kitchen similarly ready.
Yesterday we finished preparations, including erecting a pretty serious looking windsock for the skiway. Then we got two Basler
The departure of our French colleagues was a mixed experience: bidding farewarell to colleagues we had come to know at close quarters in the two plus weeks since the traverse began, but also knowing we were moving on to the next phase in the project.
There was some reluctance on behalf of the traverse to leave just three of us in such a remote location, but by Thursday we were very well established and they have other commitments and fuel limitations which made a departure timely. We watched them complete their pre-start routine, warming the tractors as they lumbered around a groomed track to warm up before hitching up and trying to move. In the days on site, they vans had stuck pretty well, and it took some fancy work to get it all moving, unbogging a couple of stuck tractors on the way. They crawled off onto the horizon, becoming small specks after many tens of minutes.
The weather on departure day wasn't suitable for a flight, so we spent most of our efforts getting the camp ready for more people - putting bedding in tents, figuring out how to cram all the accumulated gear into sensible places so that newcomers could fit and getting food/kitchen similarly ready.
Yesterday we finished preparations, including erecting a pretty serious looking windsock for the skiway. Then we got two Basler
Tuesday, December 17, 2013
Aurora Basin North Update December 16
Well, a lot has been happening in recent days, but as yet, the stars
haven't aligned to bring flying weather at Casey and ABN and have an
operational skiway. Thankfully the last of these ingredients is now in
place, so next weather window will allow us to start to bring in the ABN
team. Exactly when this happens is still uncertain, with less than ideal
weather forecast for Casey in coming days, but we shall see.
At least the weather at ABN has taken a pleasing turn for the better. It
started with a glimmer of blue and brief sun late on Friday - heralded by a
pair of snow petrels: pretty impressive being 550km from the coast. The
petrels did a bit of swooping and wheeling around our tents - clearly
curious to see what it was that broke up the endless kilometres of white in
all directions. Then, as quickly as it opened up, the cloud and low
visibility resumed, shrouding the site overnight and for Saturday morning.
Finally on Saturday afternoon, there was a lasting change, with beautiful
still, sunny conditions. We finally got a clear look at the skiway for the
first time - pleased to see the fruits of the long days, but realising that
there was still work to be done to achieve the desired surface: now that it
could be seen properly.
We also got another airborne visit and scrutiny on Saturday - mechanical
rather than feathered. The Basler that will be servicing our camp, based
out of Casey, had a run to Concordia Station (Dome C) to pick up some
equipment, and decided to check us out on return. It was most impressive as
it buzzed down the length of the skiway before climbing out and turning for
Casey. Incidentally, the run to Concordia was needed to replace some
scientific equipment for ABN that was damaged on freighting into Casey. It
was fortunate that this replacement was available, as it is pivotal for
some of the firn air studies.
Knowing that every chance to advance camp setup must be taken, we have been
pushing along the unpacking of cargo and camp establishment as rapidly as
possible. A big achievement on Friday was the erection of the kitchen and
living tent - actually two 24 foot (a bit over 7m) tents butted together.
It was challenging in winds around 40km/h and drifting snow - the cover was
a 15m x 6m potential sail, but with good help from the French team and
some careful pinning of the upwind side, we avoided becoming impromptu
parasailers headed for Casey.
On Sunday, French scientists Manu and Olivier did the upflow transect I
mentioned in my last post - they achieved some 65km from the ABN drill
site. The radar information will provide a good basis for understanding the
variations we see in the core, and in particular how the flow from inland
affects the core record.
Since the time is nearing for the French team to depart, last night
(Sunday), we were treated to a special dinner. Quite possibly we ate at the
best restaurant in Antarctica. Two of the French mechanics, David and Alex,
showed their other talents - they turn out to be very accomplished chefs.
We had multiple courses, with wines to complement each. We started with
specially cooked slivers of duck, with foi gras. The meal also included
other delicacies, and a first for me - frogs legs. Dessert was crepes with
chocolate sauce and optionally, grand marnier. It was a very convivial
evening and a fitting celebration of the achievement in getting to this
point.
It looks like the French will leave us on Wednesday - there's a chance of a
flight tomorrow, Tuesday, but probably not a good chance given the weather.
So tomorrow we cut the final ties of convenience/dependence on the traverse
facilities and become reliant on the camp infrastructure we have been
working on. Without fresh food inbound from Casey, we will be eating a
little more narrow diet - certainly more narrow than last night! But we
will be warm, and have an enormous amount of dry food to choose from.
One thing we will lose until our inbound Casey flight and team arrive is
email. Our full communications kit was held up in McMurdo when we came in,
and while it has subsequently arrived in Casey, it is not with us. We have
plenty of comms - two satellite phones and HF radio, but there will be no
email, or alas, blogs, until we see that plane. Stay tuned...
haven't aligned to bring flying weather at Casey and ABN and have an
operational skiway. Thankfully the last of these ingredients is now in
place, so next weather window will allow us to start to bring in the ABN
team. Exactly when this happens is still uncertain, with less than ideal
weather forecast for Casey in coming days, but we shall see.
At least the weather at ABN has taken a pleasing turn for the better. It
started with a glimmer of blue and brief sun late on Friday - heralded by a
pair of snow petrels: pretty impressive being 550km from the coast. The
petrels did a bit of swooping and wheeling around our tents - clearly
curious to see what it was that broke up the endless kilometres of white in
all directions. Then, as quickly as it opened up, the cloud and low
visibility resumed, shrouding the site overnight and for Saturday morning.
Finally on Saturday afternoon, there was a lasting change, with beautiful
still, sunny conditions. We finally got a clear look at the skiway for the
first time - pleased to see the fruits of the long days, but realising that
there was still work to be done to achieve the desired surface: now that it
could be seen properly.
We also got another airborne visit and scrutiny on Saturday - mechanical
rather than feathered. The Basler that will be servicing our camp, based
out of Casey, had a run to Concordia Station (Dome C) to pick up some
equipment, and decided to check us out on return. It was most impressive as
it buzzed down the length of the skiway before climbing out and turning for
Casey. Incidentally, the run to Concordia was needed to replace some
scientific equipment for ABN that was damaged on freighting into Casey. It
was fortunate that this replacement was available, as it is pivotal for
some of the firn air studies.
Knowing that every chance to advance camp setup must be taken, we have been
pushing along the unpacking of cargo and camp establishment as rapidly as
possible. A big achievement on Friday was the erection of the kitchen and
living tent - actually two 24 foot (a bit over 7m) tents butted together.
It was challenging in winds around 40km/h and drifting snow - the cover was
a 15m x 6m potential sail, but with good help from the French team and
some careful pinning of the upwind side, we avoided becoming impromptu
parasailers headed for Casey.
On Sunday, French scientists Manu and Olivier did the upflow transect I
mentioned in my last post - they achieved some 65km from the ABN drill
site. The radar information will provide a good basis for understanding the
variations we see in the core, and in particular how the flow from inland
affects the core record.
Since the time is nearing for the French team to depart, last night
(Sunday), we were treated to a special dinner. Quite possibly we ate at the
best restaurant in Antarctica. Two of the French mechanics, David and Alex,
showed their other talents - they turn out to be very accomplished chefs.
We had multiple courses, with wines to complement each. We started with
specially cooked slivers of duck, with foi gras. The meal also included
other delicacies, and a first for me - frogs legs. Dessert was crepes with
chocolate sauce and optionally, grand marnier. It was a very convivial
evening and a fitting celebration of the achievement in getting to this
point.
It looks like the French will leave us on Wednesday - there's a chance of a
flight tomorrow, Tuesday, but probably not a good chance given the weather.
So tomorrow we cut the final ties of convenience/dependence on the traverse
facilities and become reliant on the camp infrastructure we have been
working on. Without fresh food inbound from Casey, we will be eating a
little more narrow diet - certainly more narrow than last night! But we
will be warm, and have an enormous amount of dry food to choose from.
One thing we will lose until our inbound Casey flight and team arrive is
email. Our full communications kit was held up in McMurdo when we came in,
and while it has subsequently arrived in Casey, it is not with us. We have
plenty of comms - two satellite phones and HF radio, but there will be no
email, or alas, blogs, until we see that plane. Stay tuned...
Thursday, December 12, 2013
Aurora Basin North Update December 12
Position: ABN Campsite
Temperature (evening) -15 °C
Remarks:
We were very grateful today that we got the one tent up yesterday, because
the whole day was far too windy for any serious outside work, and certainly
for putting up a tent. We did complete unpacking of one container before
things got too bad though.
We marked out a parking/turning area off the skiway and our grooming team
from IPEV continued work roughing out the skiway itself and the parking
area. Visibility for much of the day was very poor due to drifting snow.
Already just one day after putting up the generator tent it has drifts over
30cm deep forming around it.
Aside from the bit of unpacking, we did a good deal of sorting of gear,
organising, final tying down of the one tent we have up, and importantly
got the generators commissioned and fuelling stations organised. This is a
big step toward having an independent camp running and so we are pleased
with the day.
Looking forward, the forecast remains a bit dismal for the next day or few,
with similar weather to today expected to continue. Still, we hope for gaps
where we can push forward with the unpacking and hopefully get another tent
or two up. We need to get an independent camp and skiway completed as soon
as possible so we can get the team in and also free up the French team to
depart. It looks like this will take some days yet, but as we arrived a
little early, we are still broadly on schedule.
Actually, the French scientists Manu and Olivier are planning a day trip,
some 40km "upstream" from ABN (i.e. where the ice flow direction leads)
before they leave, and they are also waiting on improved weather. They will
do radar studies and some shallow coring. This work will help the
interpretation of the main ABN ice core by giving us a clearer picture of
the upstream changes in local snowfall rate that have affected the ice at
various depths below us here.
Temperature (evening) -15 °C
Remarks:
We were very grateful today that we got the one tent up yesterday, because
the whole day was far too windy for any serious outside work, and certainly
for putting up a tent. We did complete unpacking of one container before
things got too bad though.
We marked out a parking/turning area off the skiway and our grooming team
from IPEV continued work roughing out the skiway itself and the parking
area. Visibility for much of the day was very poor due to drifting snow.
Already just one day after putting up the generator tent it has drifts over
30cm deep forming around it.
Aside from the bit of unpacking, we did a good deal of sorting of gear,
organising, final tying down of the one tent we have up, and importantly
got the generators commissioned and fuelling stations organised. This is a
big step toward having an independent camp running and so we are pleased
with the day.
Looking forward, the forecast remains a bit dismal for the next day or few,
with similar weather to today expected to continue. Still, we hope for gaps
where we can push forward with the unpacking and hopefully get another tent
or two up. We need to get an independent camp and skiway completed as soon
as possible so we can get the team in and also free up the French team to
depart. It looks like this will take some days yet, but as we arrived a
little early, we are still broadly on schedule.
Actually, the French scientists Manu and Olivier are planning a day trip,
some 40km "upstream" from ABN (i.e. where the ice flow direction leads)
before they leave, and they are also waiting on improved weather. They will
do radar studies and some shallow coring. This work will help the
interpretation of the main ABN ice core by giving us a clearer picture of
the upstream changes in local snowfall rate that have affected the ice at
various depths below us here.
On elevation and sun dogs
This picture is a nice illustration of parhelia (sun dogs) around midnight
during the traverse to ABN.
For the attentive and technically minded reader:
You may have noticed an asterix (*) in my last post regarding elevation,
which I meant to get back to in that post. I've been flagging elevation as
2677m. This isn't definitive, as it is based on barometric pressure in
conjunction with GPS (using some clever jiggery pokery in the device
itself). The alternative is pure GPS, which doesn't give good elevation
from a basic GPS. Digital elevation data for the site (Bamber's DEM)give an
elevation of 2701m, which is probably the best value we have. Eventually we
will have good a good GPS fix from a geodetic GPS we will deploy.
during the traverse to ABN.
For the attentive and technically minded reader:
You may have noticed an asterix (*) in my last post regarding elevation,
which I meant to get back to in that post. I've been flagging elevation as
2677m. This isn't definitive, as it is based on barometric pressure in
conjunction with GPS (using some clever jiggery pokery in the device
itself). The alternative is pure GPS, which doesn't give good elevation
from a basic GPS. Digital elevation data for the site (Bamber's DEM)give an
elevation of 2701m, which is probably the best value we have. Eventually we
will have good a good GPS fix from a geodetic GPS we will deploy.